Natural Hazard Vulnerabilities
The following is the working list of Natural Hazard Vulnerabilities.  Information obtained at the Public Workshop on Tuesday, August 11th will assist in adding to this listing.



Location
Vulnerability
Solution
Cost
Town wide
Proximity to Meshamosic State Forest - Forest Fire
Work with DEP and Fire Department to develop a Wildfire Plan
$20,000
Town wide
Hurricane force winds resulting in significant tree loss and road blockage
Develop Debris Management Plan
$25,000
Town wide
95 roads in town provide the only way in or out to residential areas.  Access to these areas may be cut off due to downed trees, washed out roads, traffic accidents or acts of terrorism.  
Purchase additional equipment to clear roads of downed trees, disabled vehicles, or unforeseen obstacles.  i.e. chain saws, lifting gear (chains & winches), bulldozer, chipper, wheeled excavator with grapple, tub grinder.
$900,000
Town wide
Flooding
Sand bag auger/filler, and sand bags
$20,000
Town wide
Fuel shortage for emergency vehicles caused by massive electrical power outage and road blockage due to hurricane or ice storm preventing tanker trucks from delivering fuel.
Elevated, gravity fed 10,000 gallon diesel and gasoline tanks.
$50,000
Pine Brook Road
Undersized culvert (12' corrugated steel arch pipe) results in roadway flooding.  This is the only access to 2  residences.
Replace culvert with bridge and raise the elevation of the roadway.
$705,000
North Main Street
Triple culverts carrying Christopher Brook under North Main Street are undersized.
Replace culverts with box culvert.
$400,000
White Birch Road
Bridge on White Birch Road is vulnerable to damage from flood events from Fawn Mill Brook and Loos Pond.
Replace with new larger bridge.
$500,000
Collie Brook Road
Undersized culvert results in roadway flooding
Replace with larger culvert
$40,000
Route 151
Undersized 3' diameter culvert on Mine Brook results in roadway flooding
Replace with larger box culvert
$50,000
Wopowog Road
Undersized 24" culvert on Elbow Brook results in roadway flooding and erosion of gravel surfaced road.
Replace with 3' culvert.
$10,000
Lake Drive
Undersized culvert on Hale Brook results in roadway flooding.
Replace with larger culvert.
$25,000
13 Summit Street
Pocotopaug Creek passes under the old factory building.  At high flows the water flows around the building and into lower level windows flooding the lower floor of the building.
Construct high level by-pass around the building and under Summit Street
$75,000